PROJECTS
International Projects
<-- back to main menu
Chevron - Brass River LNG Project - Nigeria
CTI has developed engineering and design support for multiple gas, condensate, and bulk flow pipelines in shallow water West Africa (Nigeria). The Brass River project consists of more than 300 miles of pipelines, including multiple shore crossings. CTI has developed cost estimates, pipeline routes, installation methods and design documentation in preparation of pipeline Front End Engineering & Design (FEED). |
Featured Projects |

Tahiti Flowlines - Gulf of Mexico
CTI has provided personnel to be part of Chevron's Tahiti Project Subsea Installation Team.
read more...

Independence Trail
Export Pipelines
The 24” Independence Trail Export Pipeline is an 134-mile pipeline initiating with a 20” SCR at the new Independence Hub floating facility located in MC 920 in approximately 7,900 fsw and terminating at a new fixed platform in WD 68 in approximately 115 fsw.
read more...
|
|
|